Monorail Reimplementation

  • “Boardwalk monorail door” has been checked off on the “Art” checklist.
5 Likes
  • “Monorail casino/LT/bowling entrance” has been checked off on the “Art” checklist.
4 Likes
  • “Arcade interior monorail door” has been checked off on the “Art” checklist.
4 Likes
  • “Tunnel” has been checked off on the “Art” checklist.
4 Likes

Though the removal of the monorail track to the other island in the plaza is the odd thing. Is there a plan to use that island in a lobby update?

They did have plans for it but scrapped it which is why the track leading to it was removed:

4 Likes

The little island will be removed unfortunately

That island should be where future events take place…

  • “LT interior monorail door” has been checked off on the “Art” checklist.
  • “Art polishing” has been checked off on the “Checklist” checklist.
  • “Stations” has been checked off on the “Checklist” checklist.
5 Likes
  • “Monorail seat logic” has been checked off on the “Checklist” checklist.
5 Likes
  • “Monorail screen” has been checked off on the “Checklist” checklist.
6 Likes
  • “Monorail voice lines (over 60 lines)” has been checked off on the “Checklist” checklist.
7 Likes